Installation-Part One

This slideshow requires JavaScript.

Installation-Day One:
Installation has hit a temporary stand still due to recent snow and cold temperatures.  The formwork was half hung before being taken down to prevent any deterioration due to the weather.   Reinstallation will resume when the weather permits.
*Special thanks to Bryan Mullaney, Mike Tuzzo, Alex Poklinkowski, Adrian Solecki, Scott Selin, Richard Stora and Lauren Oliveri
Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Installation-Part One

  1. lauren says:

    YAY!!!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s