Final Installation

Installation-Day Two:
-107 vertical cables (1/16″)
-14 horizontal cables (1/8″)
– 1200 internal formties
-50 eye bolt connection
-175 yards fusible fabric


Advertisements
Posted in Uncategorized | Leave a comment

Installation-Part One

This slideshow requires JavaScript.

Installation-Day One:
Installation has hit a temporary stand still due to recent snow and cold temperatures.  The formwork was half hung before being taken down to prevent any deterioration due to the weather.   Reinstallation will resume when the weather permits.
*Special thanks to Bryan Mullaney, Mike Tuzzo, Alex Poklinkowski, Adrian Solecki, Scott Selin, Richard Stora and Lauren Oliveri
Posted in Uncategorized | 1 Comment

Setting the I-Beams

This slideshow requires JavaScript.

I-Beams Specifications:
 – W 8×10
 – 1/2″ thru bolt
 – recessed into vertical openings to contain connections
 – rotational disks to accept varying angles of sloped ceiling conditions
*special thanks to Bryan Mullaney, Brian Fentzke, Alex Poklinkowski and Mike Tuzzo for lending your hands and time
Posted in Uncategorized | 1 Comment

Full Scale Fabrication

This slideshow requires JavaScript.

Final Formwork(completed):
 – double layer of fabric formwork adhered
 – cable connection resined in
 – silicone bead applied
 – center circles formed
 – cables cut and crimped
 – I-Beams fabricated(Alp Steel – Buffalo, NY)
Final Formwork(yet to be completed):
 – internal form ties(pinches)
 – boundary condition resined
 – suspend system
 – Fabrication of opening connection
Posted in Uncategorized | Leave a comment

Connection Test

Objective:
 – Investigation into the load one connection can withstand before failure
Outcome:
 – 400 lbs. + before steel jig buckled and forced the concrete and fabric to shear
 – Minimal concrete fall out
 – Resin connection with silicone bead a success
Posted in Uncategorized | Leave a comment

Surface Pour – Video

Posted in Uncategorized | Leave a comment

Surface Tension – Formwork

This slideshow requires JavaScript.

Objective:
 – Horizontal surface orientation
 – Vertical and horizontal tension members
 – Interstitial pour locations